BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.5//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://cherrycitycyclists.com
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20180311T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20181104T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20190310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20191103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20200308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20201101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20190908T124500
DTEND;TZID=America/Los_Angeles:20190908T124500
DTSTAMP:20190903T195820Z
CREATED:20190903T195820Z
LAST-MODIFIED:20190903T195820Z
UID:600-1567946700-1567946700@cherrycitycyclists.com
SUMMARY:Progressive wkend # 5 of 6 on Sunday -  Cull Canyon x 2
DESCRIPTION:2+/L/12\, 30 or 42 miles \nJoin me on a small group progressive which began on Aug 10 & 11 \nTour the Bay Area and see what’s in our own backyard. \nThere are 3 rides left of the series and it’s not too late to participate in the program. \nIf you were waiting for terrain that’s a little more challenging….these are it. \nNote:  \nEach ride is progressively longer in distance and the terrain more challenging. The goal is to build endurance to ride 40 miles and prepare some on upcoming events such as the Waves to Wine (43 & 42 miles back to back) or the Tour De Fuzz. \nIf you can only ride Saturday’s or Sunday’s? No problem. \nThere will be ride offerings for both days so that you can do one or the other or both pending your personal goals. \nThe last progressive ride is on Sunday\, September 15th. \nMeet 12:45 pm at San Leandro BART. This ride rolls from the station at 1:00 pm. \nWe’ll be riding through parts of San Leandro to a scenic road in Castro Valley called Cull Canyon. This is a gem. A 6 mile pastoral road to a dead end and a popular road used by cyclists. The rolling terrain and gradual climb to the end of Cull Canyon is a good road for training. On other days you can do 12 mile hill repeats from the staging area. \nThese are your options: \nStart from SL BART and do a 2nd repeat on Cull Canyon = 42 miles \nStart from SL BART and do 1 loop on Cull Canyon = 30 miles \nMeet 2:00 pm at the Cull Canyon Staging Area at Cull Canyon Rd & Briar Ridge Rd intersection. Each loop is 12 miles. \nBring water\, snack and $$. \nContact: Vicky Ma 510 813-6690 mobile/text or creativesource@outlook.com
URL:https://cherrycitycyclists.com/event/progressive-wkend-1-of-6-on-sunday-wente-winery-2-3-2/
LOCATION:San Leandro BART\, 1401 San Leandro Blvd\, San Leandro\, CA\, 94577
END:VEVENT
END:VCALENDAR