BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://cherrycitycyclists.com
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20250503T110000
DTEND;TZID=America/Los_Angeles:20250503T153000
DTSTAMP:20260619T054911
CREATED:20250421T211258Z
LAST-MODIFIED:20250421T221525Z
UID:9209-1746270000-1746286200@cherrycitycyclists.com
SUMMARY:Redwood Road Pinehurst Skyline Loop
DESCRIPTION:Saturday May 3\, 2025\n35 miles;  3200 feet climbing;  average speed around 10 mph (leisurely\, with frequent regroupings)\nThis is a ride up the newly reopened Redwood Road\, then up Pinehurst to Skyline and South on Skyline all the way.  We can go through the golf course and down a dirt road (1/4 mile) to get to the Lake Chabot shoreline trail and thus back to Castro Valley – for an optional cafe stop. \nStart and end at Castro Valley BART.  Meet at 11:00 in front of the main entrance.  Bring water\, bars\, $$ for coffee/food stops.   \nRIDE LEADER:  Steven Yoder   (510) 394-8684    email: steve@zlcsoftware.com
URL:https://cherrycitycyclists.com/event/redwood-road-pinehurst-skyline-loop/
LOCATION:Castro Valley BART\, 3301 Norbridge Ave.\, Castro Valley\, CA\, 94546\, United States
CATEGORIES:CCC Events,Rides
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20250517T103000
DTEND;TZID=America/Los_Angeles:20250517T153000
DTSTAMP:20260619T054911
CREATED:20250511T051727Z
LAST-MODIFIED:20260417T202639Z
UID:9319-1747477800-1747495800@cherrycitycyclists.com
SUMMARY:Pleasanton Bart Collier Canyon and Livermore
DESCRIPTION:  \n\n\n\nSaturday May 17\, 2025\nElevation 1000 ft climbing; average speed around 10 mph\, approx 32 miles\nMake sure to sign the Ride Waiver form \nMeet at 10:30 am. Start and end at Pleasanton BART (Southwest parking lot). We will travel out through the Livermore vineyards then north through downtown Livermore and up the gentle climb of Collier Canyon.  We will return along Highland and down Camino Tassajara. We will stop at Starbucks at mile 16 and then a food-stop at Whole Foods at mile 30. \nThe ride will be canceled if the chance of rain is 30% or more. \nRide Leader: Steven Yoder   510-394-8684 or by email: steve@zlcsoftware.comBring a helmet\, carry a nutritional bar\, two bottles of water and $ for food. \nRide with GPS link \n \n 
URL:https://cherrycitycyclists.com/event/pleasanton-bart-collier-canyon-and-livermore/
LOCATION:Pleasanton BART\, 5801 Owens Dr.\, Pleasanton\, CA\, United States
CATEGORIES:CCC Events,Rides
END:VEVENT
END:VCALENDAR