• Pleasanton Bart Collier Canyon and Livermore.

    Pleasanton BART 5801 Owens Dr., Pleasanton, CA, United States

      Saturday May 17, 2025 Elevation 1000 ft climbing; average speed around 10 mph, approx 32 miles Meet at 10:30 am. Start and end at Pleasanton BART (Southwest parking lot). We will travel out through the Livermore vineyards then north through downtown Livermore and up the gentle climb of Collier Canyon.  We will return along […]

  • West Dublin BART, Calaveras, Warm Springs BART

    West Dublin BART 6501 Golden Gate Dr, Dublin, CA, United States

      Saturday, May 24th Average speed around 10 mph starting @ 10:30 AM: elevation 2150 ft, approx 33 miles RSVP via text, 408-868-8707, by Friday by 6 pm Meet at 10:30am at West Dublin BART (South side of 580, parking structure exit). We will head down Foothill, ride alongside the scenic Calaveras Reservoir, descend into […]

  • Fieldwork San Mateo

    Fieldwork Brewing Company San Mateo 3030 S Delaware St, San Mateo, CA, United States

    3/L-T/42 miles with options Meet 9:45 at Fieldwork Brewing Company in San Mateo for a 10:00 a.m. start. We'll make our way over to Crystal Springs Rd to Canada Rd and ride along the Crystal Sprngs Reservior over to Huddart Park. The route continues down the lower part of Kings Mountain to Roberts Market for […]

  • Cull Canyon and the Bay Trail

    Fieldwork San Leandro 100A W Juana Ave, San Leandro, CA, United States

    Moderate terrain/10-12 mph/approx 36 miles/elevation approx 1,260 ft It’s hot today. Let’s op for a cooler route vs Livermore which is slated to be in the 90’s. Early start to beat the heat. Meet 8:15 am at Fieldwork San Leandro for a 8:30 start to Cull Canyon out and back on pastoral roads. We’ll break […]

  • Canceled Del Valle from Pleasanton BART & back with options

    Pleasanton BART 5801 Owens Dr., Pleasanton, CA, United States

    Hills/10-12 mph/39 miles/elevation 1,500 ft This ride is cancelled due to excessive heat. Meet 10:00 a.m. at the Pleasanton/Dublin Bart Station (the end of the line) on the Pleasanton side parking lot pick up area. The hills are on the middle portion of the route bookend by flat roads. We'll take the Iron Horse Trail […]

  • Tour of San Francisco Lite

    SF Ferry Building 1 Ferry Building, san francisco, CA, United States

    Tour of SF Neighborhoods. 25 miles; moderate climbing, elevation 1437 ft.

  • Carquinez Scenic Drive CCW

    Pleasant Hill BART 1365 Treat Blvd., Pleasant Hill, CA, United States

      Sunday, June 15th Mostly moderate rollers plus one climb out of Crockett, then a long descent; approx 35 miles, 3800 feet. This is a good ride to take BART: we will meet at 10:50am at the Pleasant Hill BART main entrance. Arrive at 10:50 am, so we'll have time to sign our Ride Waiver […]

  • Napa, Atlas Road

    Model Bakery 644 1st Street, Napa, United States

    hill/8-10 mph/34 miles/elevation 2,869 ft For those who like hills, this is a good one. Goes to a dead end. A mostly quiet road, few cars and spectacular views. There are short 10-13.2% pitches on this 8 mile climb. The average is about 8%. Meet 9:15 a.m. in front of Model Bakery just outside of […]

  • Bike East Bay Volunteer Night

    Bike East Bay Office 466 Water St, Oakland, CA, United States

    Flat/10-12 mph/15-20 miles/elevation 150 ft Let's give back to our Bay Area Advocate for the cycling community by volunteering 6-8 pm. Help them tackle large scale projects while socializing with fellow Bike East Bay members and supporters. Snacks will be provided. Feel free to sign up at BayEastBay.org in the menu under "Get Involved" even […]

  • Emeryville Fire Station to Pt. Richmond flat ride

    Emeryville Fire Station 2333 Powell St, Emeryville

      Saturday, June 28th Flat ride: 344 ft elevation with an option for a hill, 10-15 mph, approx. 25 miles  This is a RSVP event text me at 510-788-0597 by Friday 8pm. Make sure to fill out the Ride Waiver form. Met in front of the Emeryville Fire Station at 9:50 am and leave at […]