- This event has passed.
Progressive wkend # 5 of 6 on Sunday – Cull Canyon x 2
September 8, 2019 @ 12:45 pm
2+/L/12, 30 or 42 miles
Join me on a small group progressive which began on Aug 10 & 11
Tour the Bay Area and see what’s in our own backyard.
There are 3 rides left of the series and it’s not too late to participate in the program.
If you were waiting for terrain that’s a little more challenging….these are it.
Note:
Each ride is progressively longer in distance and the terrain more challenging. The goal is to build endurance to ride 40 miles and prepare some on upcoming events such as the Waves to Wine (43 & 42 miles back to back) or the Tour De Fuzz.
If you can only ride Saturday’s or Sunday’s? No problem.
There will be ride offerings for both days so that you can do one or the other or both pending your personal goals.
The last progressive ride is on Sunday, September 15th.
Meet 12:45 pm at San Leandro BART. This ride rolls from the station at 1:00 pm.
We’ll be riding through parts of San Leandro to a scenic road in Castro Valley called Cull Canyon. This is a gem. A 6 mile pastoral road to a dead end and a popular road used by cyclists. The rolling terrain and gradual climb to the end of Cull Canyon is a good road for training. On other days you can do 12 mile hill repeats from the staging area.
These are your options:
Start from SL BART and do a 2nd repeat on Cull Canyon = 42 miles
Start from SL BART and do 1 loop on Cull Canyon = 30 miles
Meet 2:00 pm at the Cull Canyon Staging Area at Cull Canyon Rd & Briar Ridge Rd intersection. Each loop is 12 miles.
Bring water, snack and $$.
Contact: Vicky Ma 510 813-6690 mobile/text or creativesource@outlook.com
Details
- Date:
- September 8, 2019
- Time:
-
12:45 pm
- Event Tags:
- cull canyon, hill repeats, San Leandro BART
Organizer
- Cherry City Cyclists VM
- Phone
- 1 (510) 813-6690
- View Organizer Website
Venue
- San Leandro BART
-
1401 San Leandro Blvd
San Leandro, CA 94577 + Google Map - Phone
- 1(510) 465-2278
- View Venue Website